this post was submitted on 17 Jan 2024
68 points (94.7% liked)

Green Energy

2175 readers
90 users here now

everything about energy production

founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] perestroika 9 points 9 months ago

Yep. As for why:

  • the material being raised and lowered must be very cheap (to be able to afford much of it)
  • the material must be possible to automatically handle in arbitrary amounts
  • the friction of raising / lowering the material must be low
  • the handling should not require a slope of particular grade or a specific height

Trains fail the cheapness and arbitrary amount check, along with the slope grade check. Sand fails the friction check. Concrete blocks are close to failing the cheapness and arbitrary amount check. Cranes fail the specific height check for certain ranges of height.

Water... it also requires a certain slope grade, but the range is not narrow.