this post was submitted on 01 Oct 2023
92 points (97.9% liked)

Green Energy

2125 readers
82 users here now

everything about energy production

founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] Antitoxic9087 2 points 11 months ago* (last edited 11 months ago)

Inflexibility of conventional power plants is one issue, but for Ireland things have developed to a point I suspect it is no longer the main operational constraint on the grid.

Ireland is an island grid and needs to keep system inertia on its own (HVDC connection with neighbors cannot synchronize Ireland's grid with UK's, let alone continental Europe). This service is traditionally provided by conventional power plants in GW scale grids, but soon when synchronous condenser and inverter-based solutions become norm, there is no reason why 100% instantaneous wind + solar is not possible as shown already in various microgrids.

Similar develop can be observed in other islanded or nearly islanded GW scale grids such as South Australia.