this post was submitted on 30 Aug 2023
111 points (93.7% liked)
World News
32311 readers
670 users here now
News from around the world!
Rules:
-
Please only post links to actual news sources, no tabloid sites, etc
-
No NSFW content
-
No hate speech, bigotry, propaganda, etc
founded 5 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
China is ahead because of their advanced manufacturing economy. They literally build every single reactor component in house and don't have to really rely on any outside companies for basically anything.
They have mostly North American designed reactors, ranging from CANDUs to their version of the Westinghouse AP-1000. Westinghouse basically went bankrupt trying to make the AP-1000 a viable reactor and when they started slipping, China came in and bought the schematics, modified them, and that's their primary reactor design these days.
If you look at all the reactors worldwide that are being built, the majority of them in Europe are massively behind schedule for various reasons that probably get ignored by the Chinese. For example, one of the reactors in France is multiple billions above budget and about a decade behind due to the lack of precision of the builders, forcing them to re-assess and re-build key structural components multiple times over.
Western intelligence should organize Chinese labor.
It is important to keep in mind that, because they are copying the Westinghouse AP-1000 design several times, they can keep costs low as most construction issues have already been ironed out. They also get to build expertise by having a long program rather than just building a one off.
Well, all the reactors in Europe are supposed to be of a similar design -- they had a big push to make the EPR reactors, which are a pressurized heavy water system, which is a bit old fashioned and requires a decent amount of passive safety to be built into the system. One of the first of those series to function was actually the one built in China which saw very few cost overruns and was generally finished within the original timeframe.
Why doesn't everyone just import Chinese labour for their nuclear power plants then?
For the construction, right? That's the whole, right?