this post was submitted on 19 Oct 2024
113 points (90.6% liked)
Green Energy
2226 readers
82 users here now
Everything about energy production and storage.
Related communities:
founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
This just shows you like the idea but don't have any formal training in say constructing stuff.
Are you going to run 1000 volt through the rails? The rails who are bolted to the earth, like grounded? Did you think that one over :-) ?
I mean we all have thise fun ideas, and that's actually great, because some are good even if the overwhelming numbers are not. The thing is that all the easy ones has been taken.
About the train "deploying tons a day", where did you get that from? Also with hundred of thousands panels lining your train tracks you'll need to replace broken ones, will you stop regular trains to do that?
And god forbid one rattles loose and wrecks the underside of a passing train as it gets sucked up by the wind from the moving train lol.
It's just not a good idea.
I don't know about the practicality of rails as conductor, but it wouldn't have to be high voltage.
article said special train could deploy 1000 panels per day.
The lower the voltage the higher the loss, there is a reason power lines are hundreds of thousands volts.
What about the rails being grounded?
So if the panels are square, like 1km per day? That's not much for an existing rail line, and when are you going to do it? There are trains rolling there all the time.
What do you think, is it still a good idea?
about 42 panels per hour. If that includes wiring somehow, that is faster than other solar. Maybe their daily productivity estimate includes scooting out of the way of other trains and less than 24 hours operation.
I didn't knew the problem with ordinary solar was the installation time \s
How on earth do you "scoot out of the way" of other trains when you yourself is a train?
I feel you all are just shitting me lol 😂