this post was submitted on 26 Aug 2023
846 points (94.1% liked)

Technology

59436 readers
4386 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
 

Tesla is facing issues with the bare metal construction of the Cybertruck, which Elon Musk warned was as tricky to do as making Lego bricks

you are viewing a single comment's thread
view the rest of the comments
[–] jsheradin@kbin.social 5 points 1 year ago

It's pretty common for a CMM to be in its own climate controlled room. Parts will be placed in the room and allowed to reach reference temperature for a several hours prior to measurement.

On production lines you usually skip the absolute measurement of a CMM and use go/no-go gauges. One should fit, one should not. They'll be made of a material with similar thermal expansion coefficients as your parts. As long as they've both been sitting around for a while they'll be at the same temp. They'll have expanded or contracted the same amount from reference so their relationship of go/no-go will still hold true.

The whole field of metrology is a never ending rabbit hole - really interesting the more you get into it.