this post was submitted on 12 Nov 2024
80 points (92.6% liked)

Green Energy

2282 readers
67 users here now

Everything about energy production and storage.

Related communities:

founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[โ€“] AA5B@lemmy.world 6 points 1 month ago (1 children)

At the cost of making any maintenance harder, creating a very long layout so no likelihood of redundant connections, and putting breakable objects in a high impact zone

[โ€“] Comment105@lemm.ee 2 points 1 month ago* (last edited 1 month ago)

If the system is made well, maybe it can be very easy to drive a carriage over them and remove a lot of them relatively quickly.

I wonder if they can get away with just using a single bolt for each panel. Or maybe none, just long pins and the power connection. Unplug and lift straight up? Maybe it doesn't have to be a big issue.

I'll have to check if there are detailed plans.