this post was submitted on 19 Oct 2024
113 points (90.6% liked)

Green Energy

2224 readers
73 users here now

Everything about energy production and storage.

Related communities:

founded 2 years ago
MODERATORS
 

I'm all for putting solar panels all over the place, but won't these get dusty and oily and need loads of cleaning after trains pass over?

Also, costing €623,000 over three years sounds rather expensive for just 100m (although that roughly equates to 11KW).

you are viewing a single comment's thread
view the rest of the comments
[–] Boomkop3@reddthat.com 4 points 1 month ago

Even if not between the tracks, aside the tracks there is quite a bit of empty space. That space gets a lot less of a hard time from the trains rolling by