this post was submitted on 19 Oct 2024
113 points (90.6% liked)

Green Energy

2283 readers
20 users here now

Everything about energy production and storage.

Related communities:

founded 2 years ago
MODERATORS
 

I'm all for putting solar panels all over the place, but won't these get dusty and oily and need loads of cleaning after trains pass over?

Also, costing €623,000 over three years sounds rather expensive for just 100m (although that roughly equates to 11KW).

you are viewing a single comment's thread
view the rest of the comments
[–] Valmond@lemmy.world -4 points 2 months ago (2 children)

It did cost 600.000 euros and you call it efficient, for an idea that can be scrapped by thinking straight for 2 minutes lol.

You think the idea sounds cool, but it's just a nightmare. If you are really interested in efficiency you should look up engineering and related studies. Or just work with mechanical things. Or both.

What did you think about solar roadways?

[–] rebelsimile@sh.itjust.works 4 points 2 months ago

hang on everybody, call off the engineers, someone on the internet has thought about this for 2 minutes. good boy.