this post was submitted on 10 Aug 2024
417 points (97.5% liked)

Technology

59340 readers
5320 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] deranger@sh.itjust.works 4 points 3 months ago* (last edited 3 months ago) (1 children)

It’s an example of uncertified consumer grade equipment used in a commercial environment to disastrous results, outside of its original designed purpose. It’s one of the most well known examples of why you don’t use consumer grade hardware in a commercial/industrial setting.

It was not brought on board by the conductor or someone else, it was permanently installed in the train in place of commercial grade heaters they couldn’t source. It was installed in the wall during assembly.

I’d argue it is an example of cutting corners, they didn’t want to find / pay more for commercial grade heaters. It was not compliant with the original design nor fire safety standards.

[–] Scrollone@feddit.it 1 points 3 months ago* (last edited 3 months ago)

Wow. That's creepy in a fascinating way. Cutting corners costs lives, and this is a perfect example.