An orbital railway is needed yes, but it’ll end up being just that and likely resulting from an overground expansion (which I doubt CG want, they were trying to merge devolved railways into GBR) rather than new track (or track to patch in different parts of existing track, new track will defo be needed in east london)
Superloop is a good middle of the road option for now, where we clearly need that orbital public transport connection.